The Welding Institute


Wind Tower Generator Structures Fabrication Technologies and Quality

8 Apr 2024 9:30 AM | Anonymous

Our Offshore Energy Technical Group will be hosting their second meeting of the year, from 12:00PM – 2:00PM (UK time) on 23 May 2024.

The event, which is titled, ‘Wind Tower Generator Structures Fabrication Technologies and Quality,’ will be useful for those interested in current welding technology and fabrication standards for fabrication of heavy wall offshore structures for the offshore wind sector.

Who Should Attend?

The event should be of interest to anyone involved in design, fabrication and operation of offshore assets, with emphasis on windfarms, e.g. fabricators, designers, weld engineers, quality control personnel and windfarm developers.

Speaker and Presentations:

  • Bart Theunissen, Manager Process Technology and Innovation, Sif - Practical Experience of Utilising Electron Beam Welding for Monopile Transition Piece Longitudinal Weld (Provisional)
  • Stephan Marre, Technical and Applications Director, Lincoln Electric - Improved Productivity Saw Process For Wind Turbine Towers
  • Declan Foley, Fabrication Quality Manager, SSER - Offshore Renewables Fabrication Standards
  • TBC, Lincoln Electric - Additive Manufacturing for Offshore Wind Industry
  • TBC, TWI Ltd - TBC

FIND OUT MORE


                  


The Welding Institute

Granta Park, Great Abington, Cambridge CB21 6AL, UK

   +44 (0)1223 899000

   theweldinginstitute@twi.co.uk

Copyright © 2024 TWI Ltd. All rights reserved.

Privacy Policy